Transportation Improvement Program

TIP (FFY 2023 - FFY 2026)

Every four years, NLCOG (MPO) is required to perform a comprehensive update of the TIP document. In consultation with the MPO's Technical Committee (TCC), LADOTD, and ultimately the MPO's Transportation Policy Committee (TPC), with input from the public, the TIP is amended or modified to account for funding availability and changing funding sources or project scopes as needed. NLCOG's TPC adopted the Final Draft of the TIP (2023-2026) at its called meeting September 30th, 2022. However, the FHWA-La Div. Office requires clarification regarding some sections of the document's narrative. To address these concerns, NLCOG Staff prepared a revised TIP document (i.e., Revision 1) and has submitted this revision to FHWA La-Div. November 10th, 2022. A significant revision to the TIP document's project formatting was undertaken 04.04.2024 (Revision 2.0 is provided below).

TIP Document - Revision 2.0
Entire TIP - Revision 2.0 Document (5.2Mb pdf - Last Update: 08.21.2024)

Transit Program Summary
Highway Program Summary
Caddo Parish / Shreveport Project Summary
Bossier Parish / Bossier City Project Summary
Desoto Parish Project Summary
Webster Parish Project Summary

TIP Modifications
Modifications:11152024-05 and 11152024-06 / Shreveport: PVMT PRGRM (ASP REHAB)& PVMT PRGRM (PANEL REPLACE) - Move Eng. Phase to 2025
Modification:10302024-02 / SPORTRAN: FTA Sect. 5339(c), Lo-No Emissions Program assistance move from FFY 2024 to FFY 2025
Modification:10302024-01 / SPORTRAN: Updates the original request FTA Sect. 5339(b) assistance, move from FFY 2024 to FFY 2025
Modification:04092024-01 / NLCOG: Correct a technical error
Modification:03272024-01 / Shreveport PVMT Program (ASP and Panel Replace) Reformat TIP Project Records
Modification:03192024-01 / SPORTRAN: Update FTA Sect. 5339 Program Costs
Modification:01222024-01 / SPORTRAN: Update 2022 apportionment
Modification:12082023-01 / Linwood Ph. III
Modification:01312023-01 / Jimmie Davis Br.
Modification:10252022-01 / Cross Bayou Br.
Modification:10252022-02 / Market St. Br. @ ICG
Modification:09132022-01
Modification:07262022-01
Modification:01072022-01
Modification:01262022-01

TIP Amendments

Public Comment Period Open

None at this time.

Date of
Introduction
Status State
Project ID
Project Name/
Description
Current
Phase
Purpose of TIP Request Request Documentation
MPO Certification
Date of
Adoption
01.17.2025 Introduction NLCOG TPC H.012030 LADOTD: US371 - KCS RR OVERPASSES HBI Engineering Request is to add the Construction Phase funding to the project in FFY 2025. 01172025-02

01.17.2025 Introduction NLCOG TPC H.015724 LADOTD: KINGS HWY - HEALTHCARE & DEV. CORRIDOR Engineering Request is to add the project to the current TIP in FFY 2025. 01172025-01

12.06.2024 NLCOG Adopted / Submit LADOTD H.007404 LADOTD: OIL CITY SHARED USE PATH Remove from TIP Request is to remove the project from the TIP per letter from Town of Oil City. 12062024-09

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.014236 LADOTD: LA 3008: BRIDGES NEAR COTTON VALLEY Engineering Request is to move the Construction Phase to FFY 2027. 12062024-08

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.014059 LADOTD: US 80: BRIDGES NEAR MINDEN Engineering Request is to add $675K to Engineering Phase and move the Construction Phase to FFY 2027. 12062024-07

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.012008 LADOTD: US 71: ICG RAILROAD OVERPASS REHAB (HBI) Plan./Environ. Request is to move the Emgineering Phase to FFY 2026 and move the Construction Phase to FFY 2028. 12062024-04

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.012005 LADOTD: US 80: KCS RR OVERPASS (HBI) Engineering Request is to add funding to the Emgineering Phase and move the Construction Phase to FFY 2027. 12062024-03

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.012009 LADOTD: US 71: MARKET ST BRIDGE OVER ICG RR (HBI) Plan./Environ. Request is to move the Construction Phase to FFY 2027 12062024-02

MPO Policy Certification
01.17.2025
12.06.2024 NLCOG Adopted / Submit LADOTD H.010468 LADOTD: I-20: MONKHOUSE TO I-49 Plan./Environ. Request is to revise the scope of the project, add Construction Phase funding, and Move Construction Phase to FFY 2028 12062024-01

MPO Policy Certification
01.17.2025
07.19.2024 NLCOG Adopted / Submit to LADOTD 5339-24-03 SPORTRAN: New Award FTA Section 5339(c) Transit Request is to add FTA's Awarding SPORTRAN a Low-No Emission Vehicle Program Grant Assistance (FTA Section 5339c). 07192024-02

MPO Policy Certification
08.16.2024
07.19.2024 NLCOG Adopted / Submit to LADOTD 5339-24-02 SPORTRAN: FTA Section 5339b (rural funding assistance - bus and bus facilities) Transit Request is to update SPORTRAN's 5339(b) grant assistance with new FFY2023 Apportionment amount. 07192024-01

MPO Policy Certification
08.16.2024
06.28.2024 NLCOG Adopted / Submit to LADOTD 5307-01 to 5307-04 SPORTRAN: FTA Sect. 5307 Grant Assist. Award Transit Request is to update SPORTRAN's 5307 budget items with current FY2023 Apportionment amounts and add a new budget line item. 06282024-01

MPO Policy Certification
07.19.2024
04.12.2024 NLCOG Adopted / Submit to LADOTD H.015451 Shreveport: Audrey Lane Reconstruction Design/Engineering Shreveport requests the removal of the project from the TIP/STIP. 04122024-01

MPO Policy Certification
06.07.2024
10.27.2023 Adopted/STIP N/A NLCOG: LADOTD funding transfer request (initiated) LADOTD Transfer Procedure Requesting the transfer of STBG>200k programmatic funding (highway) to FTA Section 5307 (transit) funding availability on behalf SPORTRAN 10272023-04

MPO Policy Certification
12.08.2023
10.27.2023 Adopted/STIP H.014054 NLCOG: New I-69 Frontage Rd Connector (Ellerbe-LA 1) Engineering Update TIP request to align with LADOTD funding, phasing, and scheduling estimates Contract No. 4400027735 / 10272023-03

MPO Policy Certification
12.08.2023
10.27.2023 Adopted/STIP H.005184 LADOTD: New I-69 Frontage Rd Connector (Stonewall/Frierson-Ellerbe) Engineering Update TIP request to align with LADOTD funding, phasing, and scheduling estimates Contract No. 4400027735 / 10272023-02

MPO Policy Certification
12.08.2023
10.27.2023 Adopted/STIP H.014056 NLCOG: New I-69 Frontage Rd Connector (Stonewall-Frierson) Engineering Update TIP request to align with LADOTD funding, phasing, and scheduling estimates Contract No. 4400027735 / 10272023-01

MPO Policy Certification
12.08.2023
06.23.2023 Adopted/STIP H.015632 NLCOG ACTIVE TRANSPORTATION PLAN Plan./Environment New 4 Parish Active Transportation Plan and change fund source. 06232023-01

MPO Policy Certification
09.23.2023
04.21.2023 Adopted/STIP H.001779 LADOTD: JIMMIE DAVIS BRIDGE (LA 511) (HBI) Construction Increase Construction Phase funding. 04212023-01

Public Comment Information Graphic

MPO Policy Certification
04.21.2023
01.20.2023 Adopted/STIP H.012227 LADOTD: LA 5 - THOMAS ROAD TO LA 172 Construction Add Construction Phase funding. 01202023-01

Public Comment Information Graphic

MPO Policy Certification
02.17.2023
04.22.2022 Adopted/STIP 5339-02 SPORTRAN: Rural Sect. 5339 Grant Assist. Award Transit Bus shelter improvements across the Service Area (SA) 04222022-04

TIP Transit Program agenda items

MPO Policy Certification
05.27.2022
04.22.2022 Adopted/STIP H.000413 LADOTD: CROSS BAYOU BRIDGE REPLACEMENT Feasibility / Eng. Add feasibility study and engineering phase costs 04222022-03

TIP highway program agenda items

MPO Policy Certification
05.27.2022
04.22.2022 Adopted/STIP 5339-01 SPORTRAN: Rural Sect. 5339 Grant Assist. Award Transit Procurement: back-up CNG-fueled generator; replacement of safety sensitive equipment 04222022-02

TIP Transit Program agenda items

MPO Policy Certification
05.27.2022
04.22.2022 Adopted/STIP H.001779 LADOTD: JIMMIE DAVIS BRIDGE (LA 511) (HBI) Const. Add Construction Phase funding to the project 04222022-01

TIP highway program agenda items

MPO Policy Certification
05.27.2022
01.21.2022 Adopted/STIP H.000413 LADOTD: Cross Bayou Bridge Replacement Const. Move Construction Phase to FFY 2025 (outside current TIP cycle) 01212022-01

Public Comment: 03.01.2022 - 03.30.2022

MPO Policy Certification
01.21.2022 Adopted/STIP H.013759 LADOTD: LA 3276: US 171 - I-49 Const. Add Const. Phase in FFY 2022 01212022-02

Public Comment: 03.01.2022 - 03.30.2022

MPO Policy Certification
11.19.2021 Adopted/STIP H.010468 LADOTD: I-20 - MONKHOUSE TO I-49 Eng. Add Engineering Phase Costs 11192021-01

Public Comment: 12.03.2021 - 01.01.2022
11.19.2021 Adopted/STIP H.010206 LADOTD: LA 3132 at LA 523 Extend Control of Access Const. Move Const. Phase from FFY2022 to FFY2023 11192021-02

Public Comment: 12.03.2021 - 01.01.2022

Archived Amendments and Modifications
2021 Archive
2020 Archive
2019 Archive